Processing

Peak's Resource Portal
Account Menu
  • Log in
  • Contact us
  •  Dash
  •  Featured collections
  •  Recent
  •  Knowledge Base
 All resources
Product Range
By date

 Geographic search

 Advanced search


Log in

Username
Password


 Click here to apply for an account

 Click here if you have forgotten your password
 Use SSO to log in

Powered by Powered by ResourceSpace
View all results

ZA 070A - IQ/OQ 

Full screen preview

Resource tools

Original PDF File

179 KB Download

View directly in browser

179 KB View in browser
  •  Share
Resource details

Resource ID

888

Access

Open

Contributed by

Rachel Beel

Updated date

30 June 17

Review date

20 January 23

Title

ZA 070A - IQ/OQ

Revision Number

2

Revision Details

Updated calibration section and documentation section.

Keywords

4 IQOQ, IQ, OQ, IQ/OQ, Installation Qualification Operational Qualification

Product Range

Other

Language

UK English

Company Brand

Peak Scientific

Public / Private

private

Reviewed by Rachel Beel 18/01/22.

Extracted text

INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:

ZA Range

Model:

ZA070A

Instrument Description:

Zero Air Generator

Manufacturer:

Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK

Service Contact:

Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com

Serial Number:
Condition when Received:

New
Used
Reconditioned

Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 1 of 8

INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter

Specified Range

Acceptable

Output
Nitrogen Pressure

80 psi (5.5bar)

Nitrogen Flow Rate

7 l/min (ATP)

Environment and Siting
Has the instrument been adequately acclimatized since transport or storage?
(Requires 3 hours before operation)
Yes

No

Operating Parameter

Specified Range

Ambient Temperature

Acceptable

5-30 ºC (41-86 ºF)

Maximum Relative Humidity

80% Non-Condensing

Maximum Altitude

2000 m (6500 ft)

Supply Voltage & Frequency

230V ±10%, 50/60Hz
Refer to User Manual for acceptable range

Siting – In-House / Large Space

Minimum Clearance around Machine – 75mm

Siting – In-House / Confined Space

Air Conditioner/Extraction Fan

Mains Power Outlet

Within 2m Radius to Generator

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 2 of 8

INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes

No

If yes, state missing items:
Is there any damage to the instrument?
Yes

No

Yes

No

If yes, describe damage:

Manufacturer informed:

Is all standard documentation included?
Present

Missing

User Manual (available via download from Peak Extranet)
Fittings Kit
Warranty Registration Card

Installation
Installed By:

User

Authorized Engineer

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 3 of 8

INSTALLATION QUALIFICATION
Summary Report
Instrument:

ZA070A

Serial Number:

Assessment of Complete Installation Qualification:
No Deviations
Deviation

Deviations

Impact on Operation

Justification for Acceptance

Successful completion of the preceding activities and checks indicates that this instrument has been
satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:

Date:

Deviations Approved By:

Date:

IQ Approved By:

Date:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 4 of 8

OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check

OK

Discrepancy

N/A

Pressure gauges showing 0 psig
Nitrogen Outlet Disconnected
Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 5 of 8

Functional Tests
Functional Test

Acceptance Criteria

Pass

Apply Mains Power / Switch On

Compressor functions

Fail

Allow to run for 10 minutes.
(Ensure Side Panels are fitted)

Pressure builds to 80 PSI

Catalyst Chamber reaches
temperature

Digital display shows 400°C &
Green LED Illuminates

Output pressure

Stable pressure shown on panel
pressure gauge (80 PSI)

After 8 Hours 1. Power-off / Isolate Generator from Mains Power / Allow pressure to drop to Zero
2. Connect Gas line to instrument
3. Apply Mains Power / Switch On
Output pressure

Stable pressure shown on panel
pressure gauge (80 PSI)

Output Connection Leak Tight

No Leaks

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 6 of 8

OPERATIONAL QUALIFICATION
Calibration
This instrument is supplied fully calibrated by the manufacturer using equipment traceable to national
standards. Calibration directly following installation is not usually required.
Calibration Step

OK

Not Done

Calibrate output flow(s)
Calibrate output pressure(s)
Flow Meter Serial Number :

Calibration
Due Date :

Pressure Gauge Serial Number :

Calibration
Due Date :

Comments:

Training
Date Instrument Released for Use:
Trained Operators

Read User
Manual

Practical
Training

Authorized Signature

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 7 of 8

OPERATIONAL QUALIFICATION
Summary Report
Instrument: ZA070A

Serial Number:

Assessment of Complete Operational Qualification:
No Deviations
Deviation

Deviations

Impact on Operation

Justification for Acceptance

Successful completion of the preceding activities and checks indicates that this instrument is
operating satisfactorily following delivery and installation. The instrument has passed the Operational
Qualification procedure and may now be released for use.
OQ Completed By:

Date:

Deviations Approved By:

Date:

OQ Approved By:

Date:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-787
Revision: 2
Page 8 of 8

Search for similar resources