Precision Zero Air 18L (230V) - IQ/OQ
Resource tools
Original PDF File |
184 KB | Download |
View directly in browser |
184 KB | View in browser |
Alternative files | ||
IQ_OQ_PRECISION_ZERO_AIR_18L_230v_01_A_German.pdf |
102 KB | Download |
Resource ID
885
Access
Open
Contributed by
Rachel Beel
Updated date
30 June 17
Review date
18 January 23
Title
Precision Zero Air 18L (230V) - IQ/OQ
Revision Number
2
Revision Details
Updated calibration section and documentation section.
Keywords
3 IQOQ, IQ, OQ, IQ/OQ, Installation Qualification Operational Qualification
Product Range
Precision
Language
UK English
Company Brand
Peak Scientific
Public / Private
private
Reviewed by Rachel Beel 18/01/22.
Extracted text
INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:
PRECISION
Model:
ZA
Instrument Description:
PRECISION ZERO AIR 18L (230Vac)
Manufacturer:
Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK
Service Contact:
Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com
Serial Number:
Condition when Received:
New
Used
Reconditioned
Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter
Specified Range
Acceptable
Output
Zero Air
80 psig (5.51bar) Max
Zero Air Flow Rate
18 l/min (ATP)
Environment and Siting
Has the instrument been adequately acclimatized since transport or storage?
(Requires 3 hours before operation)
Yes
No
Operating Parameter
Specified Range
Ambient Temperature
5-35 ºC (41-86 ºF)
Maximum Relative Humidity
70% Non-Condensing
Maximum Altitude
2000 m (6500 ft)
230V ±10%, 50/60Hz
Refer to User Manual for acceptable range
Supply Voltage & Frequency
Siting – In-House / Large Space
Minimum Clearance around Machine – 75mm
Siting – In-House / Confined Space
Mains Power Outlet
Acceptable
Air Conditioner/Extraction Fan
Within 1.5m Radius to Generator
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes
No
If yes, state missing items:
Is there any damage to the instrument?
Yes
No
Yes
No
If yes, describe damage:
Manufacturer informed:
Is all standard documentation included?
Present
Missing
User Manual (available via download from Peal Extranet)
Certificate of Conformity
Warranty Registration Card
Installation Guide
Site Preparation Guide
(Available via Download from Peak Extranet)
Installation
Installed By:
Authorized Engineer
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
INSTALLATION QUALIFICATION
Summary Report
Instrument:
ZERO AIR
PRECISION
Serial Number:
Assessment of Complete Installation Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument has been
satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:
Date:
Deviations Approved By:
Date:
IQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check
OK
Discrepancy
N/A
Confirm inlet air meets requirement per manual.
Ensure no obstructions to underside vents
Fit 1/4” x 1/4” Compression fittings to inlet
Fit 1/4” x 1/8” Compression fittings to outlet
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
Functional Tests
Functional Test
Acceptance Criteria
Apply Mains Power / Switch On
Fascia illuminates yellow
Allow to run for 60 mins.
PASS – Fascia illuminates
Green
FAIL -
Pass
Fail
Fascia does NOT
illuminate Green
After 60 mins 1. Power-off / Isolate Generator from Mains Power
2. Connect to instrument if not already done so.
3. Apply Mains Power / Switch On
4. After a few minutes the Fascia will illuminate Green again when the system returns to
operating temperature.
Output Connections Leak Tight
No Leaks
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
OPERATIONAL QUALIFICATION
Calibration
This instrument is supplied fully calibrated by the manufacturer using equipment traceable to national
standards. Calibration directly following installation is not usually required.
Calibration Step
OK
Not Done
Calibrate output flow(s)
Serial number of calibrated flow meter:
Calibration due date of flow meter:
Calibrate output pressure(s)
Serial number of calibrated pressure gauge:
Calibration due date of pressure gauge:
Comments:
Training
Date Instrument Released for Use:
Trained Operators
Read User
Manual
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
Practical
Training
Authorized Signature
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
OPERATIONAL QUALIFICATION
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
OPERATIONAL QUALIFICATION
Summary Report
Instrument:
ZERO AIR
PRECISION
Serial Number:
Assessment of Complete Operational Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument is operating
satisfactorily following delivery and installation. The instrument has passed the Operational Qualification
procedure and may now be released for use.
OQ Completed By:
Date:
Deviations Approved By:
Date:
OQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-802
Revision: 2