BF-1160 - IQ/OQ - Collision Gas Add-on
Original PDF File183 KB |
Download |
View directly in browser183 KB |
View in browser |
Resource ID
5070
Access
Open
Contributed by
Hamish McGown
Updated date
23 November 23
Review date
23 November 24
Title
BF-1160 - IQ/OQ - Collision Gas Add-on
Revision Number
1
Revision Details
Initial Release.
Keywords
BF-1160, BF1160, 1160, Collision, Collision Gas, Collision Gas Add-on, IQ/OQ, IQOQ
Product Range
*None
Language
UK English
Company Brand
Peak Scientific
Extracted text
INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:
N/A
Model:
Collision Gas Add-On
Instrument Description:
Nitrogen Gas Generator Add-On
Manufacturer:
Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK
Service Contact:
Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com
Serial Number:
Condition when Received:
New
Used
Reconditioned
Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 1 of 9
INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter
Specified Range
Acceptable
Output
Output Pressure
83 psi (5.72 bar)
Output Flow Rate
200 cc/min (ATP)
Initialisation Time
3 hours
System Purge Time
30 minutes
Environment and Siting
Has the instrument been adequately acclimatised since transport or storage?
(Requires 3 hours before operation)
Yes
Operating Parameter
Ambient Temperature
Maximum Relative Humidity
No
Specified Range
5-35 ºC (41-95 ºF)
80% Non-Condensing
Maximum Altitude
Supply Voltage & Frequency
Acceptable
3000m (9800ft)
230VAC, 50/60Hz
Refer to User Manual for acceptable range
Siting – In-House / Large Space
Minimum Clearance around Machine – 75mm
Siting – In-House / Confined
Space
Air Conditioner/Extraction Fan
Mains Power Outlet
Within 2m Radius to Generator
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 2 of 9
Comments:
INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes
No
If yes, state missing items:
Is there any damage to the instrument?
Yes
No
Yes
No
If yes, describe damage:
Manufacturer informed:
Is all standard documentation included?
Present
Missing
User Manual (available via download form Peak Extranet)
Installation Guide
Warranty Registration Card
Installation
Installed By:
User
Authorised Engineer
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 3 of 9
INSTALLATION QUALIFICATION
Summary Report
Instrument:
Collision Gas Add-On
Serial Number:
Assessment of Complete Installation Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument has
been satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:
Date:
Deviations Approved By:
Date:
IQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 4 of 9
OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check
OK
Discrepancy
N/A
Pressure bars on HMI showing 0 psi
Gas Outlets Disconnected
Power-off / Isolate Generator from Mains
Power
Drain line connected to suitable outlet
Split output fitting connected to XE35 Nitrogen
Output
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 5 of 9
Functional Tests
Functional Test
Acceptance Criteria
Apply Mains Power / Switch On
Voltage measured between
220V – 240V +/- 10%
Allow to run for 3 hours.
(Ensure Top Panel is fitted)
Output pressures
Pass
Fail
Output pressure builds to 83
psi
Stable pressure shown on HMI
pressure bars
After 30 functional test 1. Perform Calibration on the Generator
Calibration
This instrument is supplied fully calibrated by the manufacturer using equipment traceable to
national standards. Calibration directly following installation is not usually required.
Calibration Step
Pass
Fail
Calibrate output flow
Serial No. of Calibrated Flow Meter -:
Calibration Due Date of Flow Meter -:
Calibrate output pressure
Serial No. of Calibrated Pressure Gauge -:
Calibration Due Date of Pressure Gauge -:
Comments:
2. Power-off / Isolate Generator from Mains Power / Allow pressure to drop to Zero
3. Connect Gas lines to instrument
4. Apply Mains Power / Switch On
5. Allow to run for 3 hours
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 6 of 9
Functional Test contd.
Acceptance Criteria
Output pressure
Stable pressure shown on HMI
pressure bar
Output Connections Leak Tight
No Leaks
Pass
Fail
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 7 of 9
OPERATIONAL QUALIFICATION
Training
Date Instrument Released for Use:
Trained Operators
Read User
Manual
Practical
Training
Authorised Signature
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 8 of 9
OPERATIONAL QUALIFICATION
Summary Report
Instrument: Collision Gas Add-On
Serial Number:
Assessment of Complete Operational Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument is
operating satisfactorily following delivery and installation. The instrument has passed the
Operational Qualification procedure and may now be released for use.
OQ Completed By:
Date:
Deviations Approved By:
Date:
OQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-1160
Revision: 1
Page 9 of 9