Precision 500 Generator 110 - Installation Guide
Original PDF File854 KB |
Download |
View directly in browser854 KB |
View in browser |
Resource ID
301
Access
Open
Contributed by
Derek Rennie
Updated date
28 March 24
Review date
01 May 24
Title
Precision 500 Generator 110 - Installation Guide
Revision Number
1
Revision Details
First Upload
Keywords
11
Product Range
Precision
Language
UK English
Company Brand
Peak Scientific
Part Number
IG-Precision
Reviewed on 3rd May 2017 - LC
Extracted text
Installation Guide – Precision 500 Generator 110V
FITTINGS KIT
x1
Mains Cable – US
x 1m
⅜” Tygon Tube
CD containing User Manual
x1
2.5mm Hex Key
x1
Resin Column Re-fill Barbed Fitting
x1
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 1 of 8
INSTALLATION 1. 2.
Unpack the generator from the shipping crate and position on a flat surface, in desired area.
Ensure the ¼” and ⅜” plugs have been removed from the O2 and H2vents, located at the rear of the generator.
3.
4.
Connect the ⅜” tubing, contained in the fittings kit, to the H2 Delivery port at the rear of the generator.
Connect the other end of the tubing to the Application.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 2 of 8
5.
6.
Connect an external supply of deionised water to the Fill connection at the rear of the unit, using the supplied tubing. Water loading takes place automatically by means of a water pump located within the generator.
Select the mains cable from the fittings kit and plug the IEC 60320/C13 socket into the mains input at the rear of the generator.
7.
8.
110VAC 50/60Hz
Plug the mains cable into an appropriate 110VAC 50/60Hz single phase power supply.
Turn the generator on, using the switch on the back of the unit.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 3 of 8
9.
10.
The touch HMI screen will illuminate and the start screen will be displayed.
The system will now run diagnostics and a leak detection test.
* NOTE * If diagnostics are unsuccessful, an alarm will sound and a red failure screen will be displayed, complete with a mute button. The user is prompted at this point to contact their Peak service provider.
11.
12.
Upon completion of the diagnostic checks, the home screen will be displayed. The user should now select MENU.
The desired unit of measure and pressure should now be selected, by pressing the unit or pressure displayed.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 4 of 8
13.
14.
Once the desired unit of measure and pressure have been selected, pressing BACK will return the user to the home screen.
Pressing START will start the supply to the application. The unit may take a few minutes to adjust to the desired pressure.
15.
16.
The unit will now maintain the desired pressure, while the application is supplied.
The system can be stopped at any time by pressing STOP. This will return the generator to Standby mode.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 5 of 8
17.
18.
CONGRATULATIONS
It is recommended that the unit is left to run for 12 hours before utilisation. Your PEAK SCIENTIFIC gas generator is now fully installed, operational and ready to supply gas on demand to your instrument.
General Notes * The generator will operate on voltages of 110VAC +/- 10%. This means it will operate between 103V and 126V. It is okay to operate the generator on a mains voltage between 103V and 126V for a short period of time, however we would recommend fitting the listed transformer at your earliest convenience.
For all other technical specifications, operating instructions, service requirements, contact details and trouble shooting, please refer to the user manual contained on the CD supplied in the fittings kit. Please keep this for future reference.
19.
It is very important to register your generator with PEAK SCIENTIFIC. This will initiate your warranty entitlement. Please use the form on the next page to register your generator. You will need the generators serial number which can be found on the serial label on the rear of the generator.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 6 of 8
IMPORTANT DOCUMENTS Warranty Entitlement
To register your generator for your warranty entitlement, send the completed form to Peak Scientific by: • • • • Email
warranty@peakscientific.com
Online http://www.peakscientific.com/service-and-support/warranty_registration Phone +44 (0)141 530 4185 Fax +44 (0)141 812 8200 PRODUCT WARRANTY REGISTRATION
COMPANY: ADDRESS:
CONTACT NAME:
EMAIL ADDRESS:
CITY/TOWN: POSTCODE: COUNTRY: TELEPHONE:
GENERATOR SERIAL NUMBER:
MODEL TYPE: INSTALLATION DATE (DD/MM/YYYY):
Important Please Note:
You have 1 month to register your Peak Scientific product from the date of shipment. If you wish to defer installation of your generator you must notify Peak Scientific within 1 month of the shipment date. This can be done by emailing warranty@peakscientific.com Once registered the warranty will be honoured for a period of 12 months after the installation date. For any generators that remain unregistered the warranty will begin from date of shipment. Thank you on behalf of Peak Scientific.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 7 of 8
Expanding Capacity
If multiple Precision 500 generators are being installed they must be connected as shown in the image below.
The units must be connected together via the ‘Master’ port on the first Precision 500, and the ‘Slave’ port at the rear of the next Precision 500 unit. The first Precision 500 unit is automatically defined as the Master, and before the connections are made and H2 is supplied, the desired pressure must be set on all units. This must be the same pressure for all. The user can now press Start on the Master unit to begin the flow of H2. The Master will now manage all the other units. The Data Cables (08-8902) used to connect units together can be purchased from Peak Scientific.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK
T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakscientific.com E: info@peakscientific.com
Part No. IG-Precision Rev. 01 Page Page 8 of 8