Infinity 5060 - IQ/OQ
Resource tools
Original PDF File |
181 KB | Download |
View directly in browser |
181 KB | View in browser |
Resource ID
1488
Access
Open
Contributed by
Rachel Beel
Updated date
30 June 17
Review date
18 January 23
Title
Infinity 5060 - IQ/OQ
Revision Number
2
Revision Details
Updated calibration section and documentation section.
Keywords
Installation, Operational, Qualification, Compliance, Service, Protected, Operation IQOQ, IQ, OQ, IQ/OQ, Installation Qualification Operational Qualification
Product Range
Infinity
Language
UK English
Company Brand
Peak Scientific
Public / Private
private
Reviewed by Rachel Beel 18/01/22.
Extracted text
INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:
Infinity 50 Range
Model:
5060
Instrument Description:
Nitrogen Gas Generator
Manufacturer:
Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK
Service Contact:
Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com
Serial Number:
Condition when Received:
New
Used
Reconditioned
Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 1 of 8
INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter
Specified Range
Acceptable
Output
Nitrogen Pressure
100 psi (6.9 bar)
Nitrogen Flow Rate
360 l/min (ATP)
System Purge Time
1 hour
Environment and Siting
Has the instrument been adequately acclimatized since transport or storage?
(Requires 3 hours before operation)
Yes
No
Operating Parameter
Specified Range
Ambient Temperature
Acceptable
5-30 ºC (41-86 ºF)
Maximum Relative Humidity
70% Non-Condensing
Maximum Altitude
2000 m (6500 ft)
Supply Voltage & Frequency
110V/230V ±10%, 50/60Hz
Refer to User Manual for acceptable range
Siting – In-House / Large Space
Minimum Clearance around Machine – 75mm
Siting – In-House / Confined Space
Air Conditioner/Extraction Fan
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 2 of 8
INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes
No
If yes, state missing items:
Is there any damage to the instrument?
Yes
No
Yes
No
If yes, describe damage:
Manufacturer informed:
Is all standard documentation included?
Present
Missing
User Manual (available via download from Peak Extranet)
Installation Guide
Warranty Registration Card
Installation
Installed By:
User
Authorized Engineer
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 3 of 8
INSTALLATION QUALIFICATION
Summary Report
Instrument:
INFINITY 5060
Serial Number:
Assessment of Complete Installation Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument has been
satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:
Date:
Deviations Approved By:
Date:
IQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 4 of 8
OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check
OK
Discrepancy
N/A
Confirm inlet air pressure meets requirement
i.e. min. 125 psi (8.7 bar), max.145 psi (9.9 bar)
Confirm inlet air flow meets requirement i.e.
min. 1080 l/min
Power-off / Isolate Generator from Mains Power
/ Allow pressure to drop to Zero
Pressure gauges showing 0 psig
Drain line connected to suitable outlet
Nitrogen Outlet disconnected
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 5 of 8
Functional Tests
Functional Test
Acceptance Criteria
Pass
Apply Mains Power / Switch On
On-Off Switch illuminates and
Pressure Gauge shows
increasing pressure
Fail
Allow to run for 10 minutes.
(Ensure Side panel is fitted)
Output pressure
Pressure builds to 100 psi
Stable pressure shown on panel
pressure gauge (100 psi)
After 1 hour 1. Power-off / Isolate Generator from Mains Power
2. Allow pressure to drop to Zero
3. Connect Gas line to instrument
4. Apply Mains Power / Switch On
5. Allow to run for 10 minutes
Output pressure
Stable pressure shown on panel
pressure gauge (100 psi)
Output Connection Leak Tight
No Leaks
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 6 of 8
OPERATIONAL QUALIFICATION
Calibration
This instrument is supplied fully calibrated by the manufacturer using equipment traceable to national
standards. Calibration directly following installation is not usually required.
Calibration Step
Pass
Fail
Calibrate output flow(s)
Serial No. of Calibrated Flow Meter -:
Calibration Due Date of Flow Meter -:
Calibrate output pressure(s)
Serial No. of Calibrated Pressure Gauge -:
Calibration Due Date of Pressure Gauge -:
Comments:
Training
Date Instrument Released for Use:
Trained Operators
Read User
Manual
Practical
Training
Authorized Signature
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 7 of 8
OPERATIONAL QUALIFICATION
Summary Report
Instrument:
INFINITY 5060
Serial Number:
Assessment of Complete Operational Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument is
operating satisfactorily following delivery and installation. The instrument has passed the Operational
Qualification procedure and may now be released for use.
OQ Completed By:
Date:
Deviations Approved By:
Date:
OQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-867
Revision: 2
Page 8 of 8