Genius 1050 IQ/OQ
Original PDF File |
174 KB | Download |
View directly in browser |
174 KB | View in browser |
Resource ID
3171
Access
Open
Contributed by
Derek Rennie
Updated date
23 August 19
Review date
01 May 24
Title
Genius 1050 IQ/OQ
Revision Number
1
Revision Details
Initial release
Keywords
Genius, 1050, Installation, Qualification, operation, operational, IQ/OQ, IQ, OQ, Service, Certificate, certification, compliance, protected, IQOQ
Product Range
Genius
Language
UK English
Company Brand
Peak Scientific
Public / Private
private
Reviewed by Rachel Beel 18/01/22.
Extracted text
INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:
Genius 10 Series
Model:
Genius 1050
Instrument Description:
Nitrogen Gas Generator
Manufacturer:
Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK
Service Contact:
Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com
Serial Number:
Condition when Received:
New
Used
Reconditioned
Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 1 of 8
INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter
Specified Range
Acceptable
Output
Nitrogen Pressure
100psi/6.9bar
Nitrogen Flow Rate
32L/Min/1.13 CFM (ATP)
System Purge Time
30 Minutes
Environment and Siting
Has the instrument been adequately acclimatized since transport or storage?
(Requires 3 hours before operation)
Yes
Operating Parameter
No
Specified Range
Ambient Temperature
Acceptable
5-35°C (41-86°F)
Maximum Relative Humidity
80% Non-Condensing
Maximum Altitude
2000m (6500 ft)
Supply Voltage & Frequency
230V±10%, 50/60Hz
Refer to User Manual for acceptable range
Siting – In-House / Large Space
Minimum Clearance around Machine – 100mm
Siting – In-House / Confined Space
Mains Power Outlet
Air Conditioner/Extractor Fan
Within 2m Radius to Generator
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 2 of 8
INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes
No
If yes, state missing items:
Is there any damage to the instrument?
Yes
No
Yes
No
If yes, describe damage:
Manufacturer informed:
Is all standard documentation included?
Present
Missing
User Manual (available via download from Peak Extranet)
Warranty Registration Card
Installation Guide
Site Preparation Guide
(Available via Download from Peak Extranet)
Installation
Installed By:
User
Authorized Engineer
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 3 of 8
INSTALLATION QUALIFICATION
Summary Report
Instrument: GENIUS 1050
Serial Number:
Assessment of Complete Installation Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument has been
satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:
Date:
Deviations Approved By:
Date:
IQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 4 of 8
OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check
OK
Discrepancy
N/A
Compressor transit brackets x2 removed
Pressure gauges showing 0 psi
Gas outlets disconnected
Drain line connected to suitable outlet
Flow control silencers attached
Check voltage – If less than 220v, use a dual
tap transformer
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 5 of 8
Functional Tests
Functional Test
Acceptance Criteria
Pass
Fail
Compressor(s) cycle
Allow to run for 10 minutes.
(Ensure side panels are fitted)
High duty LED remains
illuminated until nitrogen
reaches 116psi
Pressure builds to 116psi
Output pressures
Stable pressure shown on panel
pressure gauge
After 30 minutes 1. Perform calibration on the generator
Calibration
This instrument is supplied fully calibrated by the manufacturer using equipment traceable to
national standards. Calibration directly following installation is not usually required.
Calibration Step
Pass
Fail
Calibrate output flows
Serial No. of Calibrated Flow Meter -:
Calibration Due Date of Flow Meter -:
Calibrate output pressures
Serial No. of Calibrated Pressure Gauge -:
Calibration Due Date of Pressure Gauge -:
Comments:
2. Power-off / Isolate Generator from Mains Power / Allow pressure to drop to Zero
3. Connect Gas lines to instrument
4. Apply Mains Power / Switch On
5. Allow to run for 10 minutes
Functional Test contd.
Acceptance Criteria
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
Pass
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Fail
Doc. Ref.: BF-966
Revision: 1
Page 6 of 8
Output pressures
Stable pressure shown on panel
pressure gauges
Output Connections Leak Tight
No Leaks
Comments:
OPERATIONAL QUALIFICATION
Training
Date Instrument Released for Use:
Trained Operators
Read User
Manual
Practical
Training
Authorized Signature
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 7 of 8
OPERATIONAL QUALIFICATION
Summary Report
Instrument:
Serial Number:
Assessment of Complete Operational Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument is
operating satisfactorily following delivery and installation. The instrument has passed the Operational
Qualification procedure and may now be released for use.
OQ Completed By:
Date:
Deviations Approved By:
Date:
OQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: BF-966
Revision: 1
Page 8 of 8