IQ/OQ - TOC 1000
Resource tools
Original PDF File |
180 KB | Download |
View directly in browser |
180 KB | View in browser |
Resource ID
4153
Access
Open
Contributed by
Rachel Beel
Updated date
16 June 21
Review date
16 June 23
Title
IQ/OQ - TOC 1000
Revision Number
1
Revision Details
Initial release
Keywords
IQ, OQ, IQ/OQ, Installation, qualification, operation, service, certificate, certification, protected, Installation Qualification, Operational, Qualification, TOC,1000, TOC1000, 3301941
Product Range
Other
Language
UK English
Company Brand
Peak Scientific
Public / Private
private
Extracted text
INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:
TOC 1000
Model (s):
230v & 120v
Instrument Description:
Zero Air Gas Generator
Manufacturer:
Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK
Service Contact:
Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com
Serial Number:
Condition when Received:
New
Used
Reconditioned
Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 1 of 8
INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter
Specified Range
Acceptable
Output
Air Pressure
50 PSI
Air Flow Rate
1 NLPM
System Purge Time
120 minutes
Environment and Siting
Has the instrument been adequately acclimatized since transport or storage?
(Requires 3 hours before operation)
Yes
No
Operating Parameter
Specified Range
Ambient Temperature
Acceptable
5-35 ºC (41-95 ºF)
Maximum Relative Humidity
70% Non-Condensing
Maximum Altitude
2000 m (6500 ft)
Supply Voltage & Frequency
230V ±10%, 50/60Hz
120V ±10%, 50/60Hz
Refer to User Manual for acceptable range
Siting – In-House / Large Space
Minimum Clearance around Machine –
100mm (sides), 110mm (rear)
Siting – In-House / Confined Space
Mains Power Outlet
Air Conditioner/Extraction Fan
Within 2m Radius to Generator
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 2 of 8
INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Packing List?
Yes
No
If yes, state missing items:
Is there any damage to the instrument?
Yes
No
Yes
No
If yes, describe damage:
Manufacturer informed:
Is all standard documentation included?
Present
Missing
Declaration of Conformity
Installation Guide
Installation
Installed By:
User
Authorized Engineer
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 3 of 8
INSTALLATION QUALIFICATION
Summary Report
Instrument: TOC 1000
Serial Number:
Assessment of Complete Installation Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicates that this instrument has
been satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:
Date:
Deviations Approved By:
Date:
IQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 4 of 8
OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check
OK
Discrepancy
N/A
Power-off / Isolate Generator from Mains
Power / Allow pressure to drop to Zero
Air Inlet connected to suitable air supply
Air Outlet disconnected
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 5 of 8
Functional Tests
Functional Test
Acceptance Criteria
Apply mains power / switch on
Rocker switch at rear will
illuminate.
Allow to run for 120 minutes
(ensure side and top panels
are fitted)
“Ready” LED Activates
Pass
Fail
Outlet pressure is 50PSI
Output flow is 1 NLPM
After functional test 1. Power-off and isolate generator from mains power
2. Allow pressure to drop to zero
3. Connect air outlet to instrument
4. Apply mains power and switch the generator on
Output pressure
Stable pressure recorded at
application
Output Connection Leak Tight
No Leaks
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 6 of 8
OPERATIONAL QUALIFICATION
Calibration
This instrument is factory tested using equipment traceable to national standards to ensure that all
technical specifications can be met. Testing directly following installation is not usually required,
however output flow and pressure may be verified using calibrated equipment.
Calibration Step
Pass
Fail
Calibrate output flow(s)
Serial No. of Calibrated Flow Meter -:
Calibration Due Date of Flow Meter -:
Calibrate output pressure(s)
Serial No. of Calibrated Pressure Gauge -:
Calibration Due Date of Pressure Gauge -:
Comments:
Training
Date Instrument Released for Use:
Trained Operators
Read User
Manual
Practical
Training
Authorized Signature
Comments:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 7 of 8
OPERATIONAL QUALIFICATION
Summary Report
Instrument: TOC 1000
Serial Number:
Assessment of Complete Operational Qualification:
No Deviations
Deviation
Deviations
Impact on Operation
Justification for Acceptance
Successful completion of the preceding activities and checks indicate that this instrument is
operating satisfactorily following delivery and installation. The instrument has passed the
Operational Qualification procedure and may now be released for use.
OQ Completed By:
Date:
Deviations Approved By:
Date:
OQ Approved By:
Date:
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK
T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com
Doc. Ref.: DOC1017
Revision: 1
Page 8 of 8