Processing

Peak's Resource Portal
Account Menu
  • Log in
  • Contact us
  •  Dash
  •  Featured collections
  •  Recent
  •  Knowledge Base
 All resources
Product Range
By date

 Geographic search

 Advanced search


Log in

Username
Password


 Click here to apply for an account

 Click here if you have forgotten your password
 Use SSO to log in

Powered by Powered by ResourceSpace
View all results

IQ OQ - PRECISION HYDROGEN SL 

Full screen preview

Resource tools

Original PDF File

210 KB Download

View directly in browser

210 KB View in browser
  •  Share
Resource details

Resource ID

3582

Access

Open

Contributed by

Rachel Beel

Updated date

01 July 20

Review date

11 April 22

Title

IQ OQ - PRECISION HYDROGEN SL

Revision Number

1

Revision Details

Intital upload

Language

UK English

Company Brand

Peak Scientific

Public / Private

public

Extracted text

INSTALLATION QUALIFICATION
Instrument Origin and Identification
Instrument Series:

PRECISION HYDROGEN

Model:

Precision Hydrogen SL

Instrument Description:

Hydrogen Gas Generator

Flow Variant:

100cc
200cc

Water Load Variant:

Manual Fill
Pumped Fill
Pressure Fill

Colour Variant:

Black
White

Manufacturer:

Peak Scientific Instruments Ltd
Fountain Crescent
Inchinnan Business Park
Inchinnan
Renfrew PA4 9RE
Scotland, UK

Service Contact:

Peak Scientific Instruments Ltd
Tel.
+44 (0)141-812-8100
Email support@peakscientific.com

Serial Number:
Condition when Received:

New
Used
Reconditioned

Date Received:
Installed Location:
Purchase Order Number:
Identification / Asset Number:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 1 of 8

INSTALLATION QUALIFICATION
Instrument Specification
Instrument Parameter
Specified Range

Acceptable

Output
Pressure

100 psi (6.9 bar)

Hydrogen Flow Rate

100cc/min (ATP)

(Select as appropriate)

200cc/min (ATP)

Environment and Siting
Has the instrument been adequately acclimatized since transport or storage?
(Requires 3 hours before operation)
Yes

No

Operating Parameter
Ambient Temperature
Maximum Relative Humidity

Specified Range
10-35 ºC (50-95 ºF)
90% Non-Condensing

Maximum Altitude
Supply Voltage & Frequency

Acceptable

3000 m (9800 ft)
100-240V ±10%, 50/60Hz
Refer to User Manual for acceptable range(s)

Siting – Generator Placement

Sit Generator on a Flat Surface
Minimum Clearance around Machine – 75mm

Siting – General Lab Conditions
Mains Power Outlet
Water Purity Requirement

Extraction Fan/Fume Hood (Recommended)
Within 2m Radius to Generator
<1.0µ Siemens/cm OR >1 Mohm-cm

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 2 of 8

INSTALLATION QUALIFICATION
Instrument Delivery and Documentation
Unpack the instrument carefully. Are any items missing against the Fitting kit list as per
Installation Guide?
Yes

No

If yes, state missing items:
Is there any damage to the instrument?
Yes

No

Yes

No

If yes, describe damage:

Manufacturer informed:
Fittings Kit

Present

Missing

Present

Missing

Fittings Kit included
Is all standard documentation included?

User Manual (Available via download from Peak Extranet)
Warranty Registration Card
Installation Guide
Site Preparation Guide
(Available via Download from Peak Extranet)

Installation
Installed By:

User

Authorized Engineer

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 3 of 8

INSTALLATION QUALIFICATION
Summary Report
Instrument:

Precision Hydrogen SL

Serial Number:

Assessment of Complete Installation Qualification:
No Deviations
Deviation

Deviations

Impact on Operation

Justification for Acceptance

Successful completion of the preceding activities and checks indicates that this instrument has been
satisfactorily delivered and installed. The instrument has passed the Installation Qualification
procedure and may now be submitted for Operational Qualification.
IQ Completed By:

Date:

Deviations Approved By:

Date:

IQ Approved By:

Date:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 4 of 8

OPERATIONAL QUALIFICATION
Pre-Run Checks
Pre-Run Check

OK

Discrepancy

N/A

Check water purity
Deioniser column installed
Connect delivery connection to instrument
Vents to fume hood
Pumped and Valved Fill generators only*
Position of water bottle
Water inlet pressure 1 ≤ P ≤ 3 bar
Connect inline water filter
Connect water supply
Comments:

*Refer to Installation Guide and User Manual for details
Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 5 of 8

Functional Tests
Functional Test

Acceptance Criteria

Pass

Fail

Fan Running
Apply Mains Power / Switch On

Bubbles produced in water tank
Water tank LED pulsing green
Water tank LED solid dim green

Allow to run for 10 minutes
Bubbles in water tank cease
Water tank LED turns solid
bright green

Press front button

Output pressure 100 psi*
No leaks between generator
and instrument

Output connections leak tight†
Notes:

* If lower pressures are required, an external pressure regulator should be fitted to the output port of
the generator.
Liquid leak detectors should not be used on the Precision Hydrogen. If a liquid solution must be
used, then it should be IPA based, or a portable Hydrogen detector should be used.
Serial number of calibrated flow meter:
Calibration due date of flow meter:
Serial number of calibrated pressure gauge:
Calibration due date of pressure gauge:
Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 6 of 8

OPERATIONAL QUALIFICATION
Training
Date Instrument Released for Use:
Trained Operators

Read User
Manual

Practical
Training

Authorized Signature

Comments:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 7 of 8

OPERATIONAL QUALIFICATION
Summary Report
Instrument:

Precision Hydrogen SL

Serial Number:

Assessment of Complete Operational Qualification:
No Deviations
Deviation

Deviations

Impact on Operation

Justification for Acceptance

Successful completion of the preceding activities and checks indicates that this instrument is
operating satisfactorily following delivery and installation. The instrument has passed the Operational
Qualification procedure and may now be released for use.
OQ Completed By:

Date:

Deviations Approved By:

Date:

OQ Approved By:

Date:

Fountain Crescent,
Inchinnan Business Park
Inchinnan, PA4 9RE
Scotland, UK

T: +44 (0)141 812 8100
F: +44 (0)141 812 8200
W: www.peakscientific.com
E: info@peakscientific.com

Doc. Ref.: BF-983
Revision: 1
Page 8 of 8

Search for similar resources