Skip to main content

Peak's Resource Portal
Menu Account
  • Log in
  • Contact us
  •  Dash
  •  Featured collections
  •  Recent
  •  Knowledge Base
Search
 All resources

By date

 Geographic search

 Advanced search

Log in

Username
Password


 Apply for an account

 Forgotten password?


 Use SSO to log in
Powered by Powered by ResourceSpace
View all results

Infinity 9000 - Site Prep Guide  

Full screen preview
Resource tools

Original PDF File

942 KB

Download

View directly in browser

942 KB

View in browser
  •  Share
  •  Edit with AI
Resource details

Resource ID

348

Access

Open

Contributed by

Derek Rennie

Updated date

24 April 18

Review date

01 May 24

Title

Infinity 9000 - Site Prep Guide

Revision Number

0-

Revision Details

Review Date Updated - LC

Keywords

5

Product Range

Other

Language

UK English

Company Brand

Peak Scientific

Extracted text

Infinity 9000 Site Preparation Guide

2014 © Peak Scientific - Rev. 0 – 22/04/14

Infinity 9000 Site Preparation Guide

Contents
Customer Responsibilities Change History Related Manuals Safety Notices Safety Notice to Users Technical Specifications Environment Inlet Conditions Outlet Gas General Site preparation Environmental control Space provision On-Site Transit Unpacking Space Required Unboxing Tubing lengths Copper Tubing 3 4 4 5 5 6 6 6 6 6 7 7 8 9 10 10 10 11 11

Page 2

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Customer Responsibilities
To ensure a successful and timely installation of your Peak generator, please refer to this set of requirements. Correct site preparation is the first key step in ensuring that your generator and systems operate reliably over an extended lifetime. This document is an information guide and checklist that outlines the requirements for your site. It is essential your site meets the following specification prior to the installation date. For details, see specific sections within this document

   

The necessary spatial requirements are met. The correct environment is provided for the generator. Adequate exhaust ventilation is provided. The correct tubing lengths and diameters are used in relation to the distance from the instrument.

Failure to meet the Site requirements of your Peak generator as stated above and detailed in this document could result in the unit underperforming and possible loss of warranty. Please sign below to confirm your compliance with the aforementioned requirements. Once complete please return to Peak Scientific, or whomever the unit was purchased from. Return addresses can be found on the back page of this document.

Name:

Company:

Signed:

Date:

Model:

Cust. Sales Order No.:

Page 3

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Change History
Rev. 1 2 3 4 Comment Name Date

Related Manuals
Document number
UM-Infinity9000 IG-Infinity9000

Manual name
Infinity 9000 User Manual Infinity 9000 Installation Guide

Description

Describes the operation of the generator and all service requirements. Supplied with the generator. Details the installation process of the generator. Supplied with the generator.

Page 4

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Safety Notices
Symbols
This manual uses the following symbols to highlight specific areas important to the safe and proper use of the Generator:

A WARNING notice denotes a hazard. It calls attention to an operating procedure, process or similar, which if not correctly performed or adhered to, could cause personal injury or in the worst case death. Do not proceed beyond a WARNING notice until the indicated conditions are fully understood or met.

A CAUTION notice denotes a hazard. It calls attention to an operating procedure, process or similar, which if not correctly performed or adhered to, could cause damage to the Generator or the application. Do not proceed beyond a CAUTION notice until the indicated conditions are fully understood or met.

Safety Notice to Users
This site preparation guide must be read thoroughly and understood before installation and operation of your Peak Infinity 9000 Generator. Incorrect preparation or use of the Generator in a manner not specified by Peak Scientific MAY impair the SAFETY provided by the equipment. When handling, operating or preparing for installation, personnel must employ safe practices and observe all relevant local health and safety requirements and regulations. The attention of UK users is drawn to the Health and Safety at Work Act 1974.

Page 5

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Technical Specifications
Environment
Min/Max Air Operating Temperature Maximum Relative Humidity 5°C-30°C / 41°F-86°F 70%

Inlet Conditions
Min/Max Air Inlet Pressure Minimum Air inlet Flow 8.3-10 bar / 120-145 psi 70 l/min

Outlet Gas
Maximum Gas output Pressure Maximum Pressure Drop (Outlet-Inlet) Maximum Gas output flow (zero grade air) Start-up time for purity Particles 100 psig 8 psig 34 l/min (ATP) 60 minutes 0.01um

General
Dimensions (cm/ins) WxDxH Shipping Weight (Kg/lbs) 47x16x76 / 19x7x30 21 / 46

Page 6

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Site preparation
Environmental control
The generator must remain on its feet to allow air intake from the bottom of the generator.

If the generator is stored in an enclosed space the environment must be controlled via an air conditioner or extraction fan.

<70%RH Max Temp; <30 C
o

30 C Max Relative Humidity;

o

>5 C

o

70% Non-Condensing

Generator MUST NOT be stored or installed outside.

Page 7

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Space provision
The minimum space should be provided as follows.... 75mm

835mm

75mm

75mm

620mm 160mm

Failing to provide adequate cooling space around the generator may cause damage to the membranes. This will reduce service life and invalidate warranty.

Page 8

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
On-Site Transit
When moving the generator in its shipping crate, doorways and other openings such as elevators must fit with the sizes in the figure below.

>600mm

>900mm

280mm

21 kg

Page 9

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Unpacking
Space Required
The image below shows the minimum space required to unpack the generator from its shipping box.

1m

1m

Top of Box

1m

1m

Unboxing
The top of the shipping box should be carefully opened and the cardboard insert removed. The generator weighs 21 kg max and as such Peak recommends a two-man lift. Ensure safe lifting practices are adhered to. All packaging should be retained for future transit.

Top

Front

Page 10

2014 © Peak Scientific - Rev. 0 - 22/04/14

Infinity 9000 Site Preparation Guide
Tubing lengths
Tubing sizes should be chosen with accordance to the diagram below.

ZONE 1 ZONE 2 ZONE 3

10m

40m

>40m

Zone 1 2 3

Distance from Instrument Up to 10m Up to 40m Over 40m

Tubing Thickness OD/ID mm (Inches) 6mm/4mm (1/4” 3/16”) 10mm/8mm (3/8” 5/16”) Consult Peak Scientific

The diameter of the tubing which will be connected to the gas outlet is important and is determined by the length of tubing required. Failure to follow these recommendations could lead to accelerated compressor wear.

Copper Tubing

Soldering may lead to contamination. Compression fittings recommended.

Page 11

2014 © Peak Scientific - Rev. 0 - 22/04/14

Peak Scientific UK Fountain Crescent Inchinnan Business Park Inchinnan PA4 9RE Scotland, UK Tel: +44 (0)141 812 8100 Fax: +44 (0)141 812 8200 Peak Scientific Germany Herriotstrasse 1 60528 Frankfurt

Peak Scientific North America 19 Sterling Road Suite #1 Billerica, MA 01862 USA Tel: +1 866 647 1649 Fax: +1 978 608 9503 Peak Scientific China Room 606 Building 1 Lane 2277 Zuchongzhi Road Pudong New Area Shanghai 201203, China Tel: +86 21 5079 1190 Fax: +86 21 5079 1191 Peak Scientific Brazil Peak Scientific Brasil Av. Quieroz Filho 1700 – torre Sunny-Conj. 602 São Paulo SP Brasil Tel: +1 866 647 1649

Peak Scientific India 202, Amsri Shamira Old Lancer Line Opp. St. Mary’s Degree College S.D. Road Secunderabad 500 025, India Tel: +91 40 2780 0663 Fax: +91 40 2780 0663 Peak Scientific Mexico Solon 352 Col. Los Morales Polanco 11530 Mexico, D.F. Mexico Tel: Fax: +1 866 647 1649 +1 978 608 9503

Peak Scientific Africa PO Box 478 Somerset Mall 7137 South Africa Tel: +27 (0)2185 16542 Fax: +27 (0)8654 64473 Peak Scientific Australia PO Box 65 Belmont Victoria 3216 Australia Tel: +61 1300 965 352

Germany Tel: +49 (0)69 677 33 490 Fax: +49 (0)69 677 33 200 Peak Scientific Taiwan 4F.-6, No.736 Zhongzheng Rd. Zhonghe Dist. New Taipei City Tel: +886 2 8226 2383 Fax: +886 2 8226 9499

Peak Scientific Japan K.K. 2-7-56, 2F Fuji Building 28 Kita Aoyama, Minato-Ku Tokyo, Japan 107-0061 Tel: +81 3-6864-0468

Peak Scientific Singapore 3 Science Park Drive #03-14 The Franklin Science Park Drive 1 Singapore, 118223 Tel: +65-6777 1966 Fax: +65-6777 1978

2014 © Peak Scientific - Rev. 0 – 22/04/14

Related resources