MS Table Site Preparation Guide
2014 © Peak Scientific - Rev. 7 – 27/02/14
MS Table Site Preparation Guide
Contents
Customer Responsibilities Change History Related Manuals Safety Notices Safety Notice to Users Technical Specification 1B/1N/1N Hi-Flow Environment Inlet Conditions Generator Outlets Electrical Requirements General Technical Specification 2B/2N Environment Inlet Conditions Generator Outlets Electrical Requirements General Site preparation Environmental control Space provision Electrical requirements Air Connection Unpacking Space Required Unpacking Tubing lengths Copper Tubing Drainage 3 4 4 5 5 6 6 6 6 6 7 7 7 7 7 8 8 9 9 10 11 12 14 14 14 15 15 16
Page 2
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Customer Responsibilities
To ensure a successful and timely installation of your Peak generator, please refer to this set of requirements. Correct site preparation is the first key step in ensuring that your generator and systems operate reliably over an extended lifetime. This document is an information guide and checklist that outlines the requirements for your site. It is essential your site meets the following specification prior to the installation date. For details, see specific sections within this document
The necessary spatial requirements are met. The correct environment is provided for the generator. Electrical outlet locations and quantities are planned. Adequate exhaust ventilation is provided. The correct tubing lengths and diameters are used in relation to the distance from the instrument.
Failure to meet the Site requirements of your Peak generator as stated above and detailed in this document could result in the unit underperforming and possible loss of warranty. Please sign below to confirm your compliance with the aforementioned requirements. Once complete please return to Peak Scientific, or whomever the unit was purchased from. Return addresses can be found on the back page of this document.
Name:
Company:
Signed:
Date:
Model:
Cust. Sales Order No.:
Page 3
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Change History
Rev. 1 2 3 4 5 6 7 Comment Power Supply Change Change to Technical Specification Layout Power Cable Amendment Technical Specification Update Voltage Amendment Added Hi-Flow Information Brand Colour Change and VAVE Updates Name Liam Couttie Liam Couttie Liam Couttie Liam Couttie Liam Couttie Liam Couttie Liam Couttie Date 09/11/12 13/03/13 04/06/13 19/07/13 30/08/13 24/10/13 12/02/14
Related Manuals
Document number
UM-MSTable IG-MSTable
Manual name
MS Table User Manual MS Table Installation Guide
Description
Describes the operation of the generator and all service requirements. Supplied with the generator. Details the installation process of the generator. Supplied with the generator.
Page 4
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Safety Notices
Symbols
This manual uses the following symbols to highlight specific areas important to the safe and proper use of the Generator:
A WARNING notice denotes a hazard. It calls attention to an operating procedure, process or similar, which if not correctly performed or adhered to, could cause personal injury or in the worst case death. Do not proceed beyond a WARNING notice until the indicated conditions are fully understood or met. A CAUTION notice denotes a hazard. It calls attention to an operating procedure, process or similar, which if not correctly performed or adhered to, could cause damage to the Generator or the application. Do not proceed beyond a CAUTION notice until the indicated conditions are fully understood or met.
Safety Notice to Users
This site preparation guide must be read thoroughly and understood before installation and operation of your Peak MS Table Generator. Incorrect preparation or use of the Generator in a manner not specified by Peak Scientific MAY impair the SAFETY provided by the equipment. When handling, operating or preparing for installation, personnel must employ safe practices and observe all relevant local health and safety requirements and regulations. The attention of UK users is drawn to the Health and Safety at Work Act 1974, and the Institute of Electrical Engineers regulations.
Page 5
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Technical Specification 1B/1N/1N Hi-Flow
Environment
Min/Max Operating Ambient Temperature Maximum Relative Humidity Maximum Altitude Min/Max Storage Temperature* 5°C (41°F) / 30°C (86°F) 70% Non-Condensing 2000 meters -20°C (-4°F) / 60°C (140°F)
*NOTE – When taken out of storage the Generator should be allowed to acclimatize at room temperature for a minimum of 3 hours before operation.
Inlet Conditions
1B Min/Max Air Inlet Pressure Minimum Air inlet Flow N/A N/A 1N 115 l/min 1N Hi-Flow 8.3-10 bar / 120-145 psi
Generator Outlets
Curtain Max Flow Curtain Max Pressure Source Max Flow Source Max Pressure Exhaust Max Flow Exhaust Max Pressure Dew Point Purity Particles Phthalates Suspended Liquids Gas Outlets Drain Outlet Pressure Gauges Start-Up Time For Purity 1B N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1N Hi-Flow 1N 10 L/min (0.35 cfm) 12 L/min (0.42 cfm) 5.5 bar (80 psi) 5.50 bar (80 psi) 22 L/min (0.77 cfm) 26 L/min (0.91 cfm) 7.5 bar (110 psi) 7.50 bar (110 psi) 10 L/min (0.35 cfm) 8 L/min (0.28 cfm) 4.1 bar (60 psi) 4.1 bar (60 psi) -11°C / 12°F ≥95 <0.01µm NONE NONE 3 x ¼” BSPP 1 x ¼” BSPP 3 30 minutes
Electrical Requirements
Voltage Frequency Current Input Connection Fuse Power Cord Type Pollution Degree Installation Category 110-240 VAC 50/60 Hz 1 Amp C14 T1.6A C13 2 II
Page 6
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
General
Dimensions in cm (“) W x D x H Weight Shipping weight Noise level Heat Output 1B 1B 100 x 83 x 80.4 (39.4 x 32.6 x 31.6) 100 kg 132.5 kg 1N 1N 103.5 kg 135 kg
54 dBA @1m 820 BTU / Hr
1N Hi-Flow 1N Hi-Flow
103.5 kg 135 kg
Technical Specification 2B/2N Environment
Min/Max Operating Ambient Temperature Maximum Relative Humidity Maximum Altitude Min/Max Storage Temperature* 5°C (41°F) / 30°C (86°F) 70% Non-Condensing 2000 meters -20°C (-4°F) / 60°C (140°F)
*NOTE – When taken out of storage the Generator should be allowed to acclimatize at room temperature for a minimum of 3 hours before operation.
Inlet Conditions
2B Min/Max Air Inlet Pressure Minimum Air inlet Flow N/A N/A 2N 8.3-10 bar / 120-145 psi 115 l/min
Generator Outlets
Curtain Max Flow Curtain Max Pressure Source Max Flow Source Max Pressure Exhaust Max Flow Exhaust Max Pressure Dew Point Purity Particles Phthalates Suspended liquids Gas outlets Drain outlet Pressure gauges Start-Up Time For Purity 2B N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2N 18 L/min (0.63 cfm) 5.50 bar (80 psi) 26 L/min (0.91 cfm) 7.50 bar (110 psi) 25 L/min (0.88 cfm) 4.86 bar (70 psi) -11°C / 12°F ≥95 <0.01µm NONE NONE 3 x ¼” BSPP 1 x ¼” BSPP 3 30 minutes
Page 7
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Electrical Requirements
Voltage Frequency Current Input Connection Fuse Power Cord Type Pollution Degree Installation Category 110-240 VAC 50/60 Hz 1 Amp C14 Plug T1.6A C13 socket to local connection (13A minimum) 2 II
General
Dimensions in cm (inches) W x D x H Weight Shipping Weight Noise Level Heat Output 100 x 83 x 80.4 (39.4 x 32.6 x 31.6) 2B 105 kg 2N 108.5 kg 2B 137.5 kg 2N 140 kg
54 dBA @1m 820 BTU / Hr
Page 8
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Site preparation
Environmental control
The generator must remain on its castors to allow air intake from the bottom of the generator.
KEEP CLEAR
If the generator is stored in an enclosed space the environment must be controlled via an air conditioner or extraction fan.
Max Temp; <30 C
o
<70% RH
30 C Max Relative Humidity; 70% Non-Condensing
o
>5 C
o
Generator MUST NOT be stored or installed outside.
Page 9
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Space provision
The minimum space should be provided as follows....
Failing to provide adequate cooling space around the generator may cause damage to the membranes. This will reduce service life and invalidate warranty.
Page 10
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Electrical requirements
The power cables shown below are supplied with the generator.
For cables pertaining to countries not displayed above, it is the responsibility of the end user to provide an appropriate power cable which meets the requirements defined in the Technical Specification section on page 6.
This unit is classified as SAFETY CLASS 1. THIS UNIT MUST BE EARTHED. Before connecting the unit to the mains supply, please check the information on the serial plate. The mains supply must be of the stated AC voltage and frequency.
The power cable supplied with the generator is 2.5m long. A mains socket providing the power should be located adjacent to the generator and within a 2m radius to the generator.
Page 11
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
2m
Air Connection
The Table–1N/1N Hi-Flow/2N Generator should be connected to a clean, dry, oil-free source of compressed air. A minimum inlet pressure of 120 psig (8.3 barg) is required. Any doubts as to the suitability of your compressed air supply should be referred to Peak Scientific or any of their authorised partners. The Compressed Air supply should be connected to the inlet located at the rear of the unit as shown in the Rear Connections section of this manual.
Page 12
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
On-Site Transit
When moving the generator in its shipping crate, doorways and other openings such as elevators must fit with the sizes in the image below.
140 kg Max.
Page 13
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Unpacking
Space Required
The image below shows the minimum space required to unpack the generator from its shipping crate.
2m
1m
Top of Shipping Crate
1m
2m
Unpacking
Remove the securing straps from the packaging and lift the cardboard lid and sleeve upwards. Then remove the front beam, and roll generator down to the ground.
Top
Front
Page 14
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Tubing lengths
Tubing sizes should be chosen with accordance to the diagram below.
ZONE 1 ZONE 2 ZONE 3
10m
40m
>40m
Zone 1 2 3
Distance from Instrument Up to 10m Up to 40m Over 40m
Tubing Thickness OD/ID mm (Inches) 6mm/4mm (1/4” 3/16”) 10mm/8mm (3/8” 5/16”) Consult Peak Scientific
The diameter of the tubing which will be connected to the gas outlet is important and is determined by the length of tubing required. Failure to follow these recommendations could lead to accelerated compressor wear.
Copper Tubing
0 Soldering may lead to contamination. Compression fittings recommended.
Page 15
2014 © Peak Scientific - Rev. 7 - 27/02/14
MS Table Site Preparation Guide
Drainage
6mm Nylon Tubing
Drain
Container
Connect the 2m Nylon tube to the drain outlet, ensure the tube is pushed fully in and gripped securely by the fitting. Fit the other end of the drain line to a suitable drain connection or container. Containers must not be airtight.
Page 16
2014 © Peak Scientific - Rev. 7 - 27/02/14
Peak Scientific UK Fountain Crescent Inchinnan Business Park Inchinnan PA4 9RE Scotland, UK Tel: +44 (0)141 812 8100 Fax: +44 (0)141 812 8200 Peak Scientific Germany Herriotstrasse 1 60528 Frankfurt
Peak Scientific North America 19 Sterling Road Suite #1 Billerica, MA 01862 USA Tel: +1 866 647 1649 Fax: +1 978 608 9503 Peak Scientific China Room 606 Building 1 Lane 2277 Zuchongzhi Road Pudong New Area Shanghai 201203, China Tel: +86 21 5079 1190 Fax: +86 21 5079 1191 Peak Scientific Brazil Peak Scientific Brasil Av. Quieroz Filho 1700 – torre Sunny-Conj. 602 São Paulo SP Brasil Tel: +1 866 647 1649
Peak Scientific India 202, Amsri Shamira Old Lancer Line Opp. St. Mary’s Degree College S.D. Road Secunderabad 500 025, India Tel: +91 40 2780 0663 Fax: +91 40 2780 0663 Peak Scientific Mexico Solon 352 Col. Los Morales Polanco 11530 Mexico, D.F. Mexico Tel: Fax: +1 866 647 1649 +1 978 608 9503
Peak Scientific Africa PO Box 478 Somerset Mall 7137 South Africa Tel: +27 (0)2185 16542 Fax: +27 (0)8654 64473 Peak Scientific Australia PO Box 65 Belmont Victoria 3216 Australia Tel: +61 1300 965 352
Germany Tel: +49 (0)69 677 33 490 Fax: +49 (0)69 677 33 200 Peak Scientific Taiwan 4F.-6, No.736 Zhongzheng Rd. Zhonghe Dist. New Taipei City Tel: +886 2 8226 2383 Fax:: +886 2 8226 9499
Peak Scientific Japan K.K. 2-7-56, 2F Fuji Building 28 Kita Aoyama, Minato-Ku Tokyo, Japan 107-0061 Tel: +81 3-6864-0468
Peak Scientific Singapore 3 Science Park Drive #03-14 The Franklin Science Park Drive 1 Singapore, 118223 Tel: +65-6777 1966 Fax: +65-6777 1978
2014 © Peak Scientific - Rev. – 27/02/14