Skip to main content

Peak's Resource Portal
Menu Account
  •  Dash
  •  Featured collections
  •  Recent
  •  Knowledge Base
  • Log in
  • Contact us
Search
  All resources

By date

Geographic search

Advanced search

Log in

Username
Password


 Apply for an account

 Forgotten password?


 Use SSO to log in
Powered by Powered by ResourceSpace
View all results

i-Flow 50* Installation Guide  

Full screen preview
Resource tools

Original PDF File

568 KB

Download

View directly in browser

568 KB

View in browser
  •  Share
  •  Edit with AI
Resource details

Resource ID

284

Access

Open

Metadata
Default

Updated date

28 March 24

Review date

01 May 24

Title

i-Flow 50* Installation Guide

Revision Number

1

Revision Details

First Upload

Keywords

3

Product Range

iFlowLab

Language

UK ​English

Company Brand

Peak ​Scientific

Part Number

IG-iFlow50

Reviewed on 3rd May 2017 - LC

Extracted text

Installation Guide – i-Flow 50* Generator
FITTINGS KIT

x1
Mains Cable – Euro 8mm Hex Key

x1

x2
12mm Compression Fitting

x1
Mains Cable – UK

x1
6mm Compression Fitting

x1
Mains Cable - US

x3
Washer for Compression Fittings

x 6m
12mm Tube 6mm Tube

x 3m

x1
CD Containing User Manual

Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK

T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakindustrial.com E: slennon@peakindustrial.com

Part No. IG-iFlow50 Rev. 00 Page Page 1 of 5

INSTALLATION 1. 2.

Unpack the generator from the shipping crate and place on a flat surface.

Ensuring that there is a seal between each fitting and port, Fit the two 12mm Straight fittings to the ‘AIR IN’ & ‘NITROGEN’ ports at the rear of the unit. Then fit the 6mm Straight fitting to the port marked ‘DRAIN’.

3.

4.
6mm Tubing

12mm Tubing Select the 12mm Tubing and connect to the ‘AIR IN’ and ‘NITROGEN’ ports, ensuring the internal olive is crimped securely. It is recommended that PTFE tape is applied to the threads to ensure a leak-tight fit.
Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK

Next, select the 6mm Tubing and connect to the ‘DRAIN’ port, again ensuring the internal olive is crimped securely.

T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakindustrial.com E: slennon@peakindustrial.com

Part No. IG-iFlow50 Rev. 00 Page Page 2 of 5

5.

6.

7.

Select the appropriate mains cable from the fittings kit and plug the IEC 60320/C19 socket into the mains input at the rear of the generator.

Plug the mains cable into an appropriate 110/230VAC 50/60Hz single phase power supply

8.

Connect the other end of the 12mm Tube from the generators ‘NITROGEN’ port to the instruments gas input; again ensure the fittings are securely fastened. The generator can now be switch on using the switch on its front panel.

The ‘NITROGEN’ pressure gauge on the front of the generator will gradually increase from 0 to 100psi as the pressure in the internal storage tank increases.

Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK

T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakindustrial.com E: slennon@peakindustrial.com

Part No. IG-iFlow50 Rev. 00 Page Page 3 of 5

9.

Your PEAK INDUSTRIAL gas generator is now fully installed, operational and ready to supply gas on demand to your instrument. General Notes < 10 meters: Use 10/8 (10mm O/D, 8mm I/D) Tubing. > 10 - 40 meters: Use 12/10 (12mm O/D, 10mm I/D). Tubing. > 40 metres: Please contact Peak Scientific with the relevant distance and we will calculate the flow resistance and the tubing size required. The imperial equivalents are: 10/8 = 3/8” O/D, 5/16” I/D 12/10 = ½” O/D, 3/8” I/D

CONGRATULATIONS

For all other technical specifications, operating instructions, service requirements, contact details and trouble shooting, please refer to the user manual contained on the CD supplied in the fittings kit. Please keep this for future reference.

28.

It is very important to register your generator with PEAK INDUSTRIAL. This will initiate your warranty entitlement. Please use the form on the next page to register your generator. You will need the generators serial number which can be found on the serial label on the rear of the generator.

Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK

T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakindustrial.com E: slennon@peakindustrial.com

Part No. IG-iFlow50 Rev. 00 Page Page 4 of 5

IMPORTANT DOCUMENTS Warranty Entitlement
To register your generator for your warranty entitlement, send the completed form to Peak Scientific by: • • • • Email
warranty@peakscientific.com

Online http://www.peakscientific.com/service-and-support/warranty_registration Phone +44 (0)141 530 4185 Fax +44 (0)141 812 8200 PRODUCT WARRANTY REGISTRATION

COMPANY: ADDRESS:

CONTACT NAME:

EMAIL ADDRESS:

CITY/TOWN: POSTCODE: COUNTRY: TELEPHONE:

GENERATOR SERIAL NUMBER:

MODEL TYPE: INSTALLATION DATE (DD/MM/YYYY):

Important Please Note:
You have 1 month to register your Peak Scientific product from the date of shipment. If you wish to defer installation of your generator you must notify Peak Scientific within 1 month of the shipment date. This can be done by emailing warranty@peakscientific.com Once registered the warranty will be honoured for a period of 12 months after the installation date. For any generators that remain unregistered the warranty will begin from date of shipment. Thank you on behalf of Peak Scientific.

Fountain Crescent Inchinnan Business Park Inchinnan, PA4 9RE Scotland, UK

T: +44 (0)141 812 8100 F: +44 (0)141 812 8200 W: www.peakindustrial.com E: slennon@peakindustrial.com

Part No. IG-iFlow50 Rev. 00 Page Page 5 of 5

Related resources
Related featured and public collections
  Products / i-Flow/i-FlowLab